ERP IMPLEMENTATION LIFE CYCLE

•ERP applications are prepackaged software developed by commercial software vendors and custom installed for organizations to automate and integrate the various business processes. Although ERP are packaged software they are very different from PC-based software packages (e.g., Microsoft Office or other software) tha t you may have purchased for personal use as shown in Table 4-1.
ERP IMPLEMENTATION PLAN
•There are three major implementation plan choices are:
1.Comprehensive.
2. Middle-of-the-Road.
3. Vanilla.


•Methodology refers to a systematic approach to solving a business problem. ERP methodology builds on the theory that an enterprise can maximize its returns by maximizing the utilization of its fixed supply of resources. Information technology, with its increasing computer power and the ability to correlate pieces of information, has proven to be the best tool for business problem solving. Like SDLC, an ERP development life cycle provides a systematic approach to implementing ERP software in the changing but limited-resource organizational environment. There are many different vendor-driven methodologies or approaches that use traditional ERP development life cycle or rapid ERP life cycles (e.g., Total Solution, FastTrack, Rapid-Re,ASAP, and BIM)
TRADITIONAL ERP LIFE CYCLE
•The traditional ERP life cycle includes the following major stages:
Stage 1. Scope and Commitment Stage.
Stage 2. Analysis and Design Stage.
Stage 3. Acquisition & Development Stage.
Stage 4. Implementation Stage.
Stage 5. Operation Stage
ROLE OF CHANGE MANAGEMENT
•Change management (CM) plays an important role throughout the ERP life cycle. System failures often occur when the attention is not devoted to this from the beginning stages
 RAPID ERP LIFE CYCLES
•They provide different methodologies and techniques for rapid or accelerated implementation. Scripts and wizards provided by consultants can help automate some of the more common tasks that occur during an implementation. These include migration of data, identification of duplicate data, and other standard tasks.
•The appropriate implementation model may vary based on company, culture, software, budget, and the purpose of the implementation, but previous implementation experience of the program management and consultants will likely be the'largest driving factor in determining the best approach
TOTAL SOLUTION
1. The Value Proposition.
2. Reality Check.
3. AlignedApproach.
4. Success Dimension.
5. Delivering Value.
FASTTRACK
•Phases Designed to reflect and integrate decisions regarding business redesign, organizational change and performance, training, process and systems integrity, client-server technologies and technical architecture.
 1. Scoping and Planning: Project definition and scope. Project planning is initiated.
2. Visioning and Targeting: Needs assessment. Vision and targets identified. As-is modeling.
 3. Redesign: To-be Modeling. Software design and development.
4. Configuration: Software development. Integration test planning.
5. Testing and Delivery: Integration testing. Business and system delivery.
•Areas In addition, it identifies five areas (groups) as an individual thread to be woven into a cohesive fabric through its five phase workplan. The areas and a list of the functions performed are as follows:
1. Project Management (project organization, risk management, planning, monitoring, communications, budgeting, staffing, quality assurance).
2. Information Technology Architecture (hardware and network selection, procurement, installation, operations, software design, development, installation).
3. Process and Systems Integrity (security, audit control).
4. Change Leadership (leadership, commitment, organizations design, change-readiness, policies and procedures, performance measurements).
5. Training and Documentation (needs assessment, training design and delivery for project team, management, end-users, operations, and helpdesk. Scripting of enduser and operations documentation).
RAPID RE
•Gateway, a consulting firm in New York, has developed an ERP life cycle methodology called Rapid Re. The five-stage, 54-step modular methodology is customized to the needs of each project because that is what happens in practice. Individual projects skip, rearrange, or recombine tasks to meet their needs or give greater or lesser emphasis to some tasks.
Stage 1. Preparation. Mobilize, organize, and energize the people who will perform the reengineering project.
Stage 2. Identification. Develop a customer-oriented process model of the business.
Stage 3. Vision. Select the processes to reengineer and formulate redesign options capable of achieving breakthrough performance
Stage 4. Solution. Define the technical and social requirements for the new processes and develop detailed implementation plans.
Stage 5. Transformation. Implement the reengineering plans. In an ideal project, stages one and two consider all key processes within a company and conclude with a step that sets priorities for the processes to reengineer. The other stages are executed repeatedly for each process selected for reengineering.
ACCELERATED SAP (ASAP)
•The ASAP Roadmap is a detailed project plan by SAP that describes all activities in an implementation. It includes the entire technical area to support technical project management, and addresses such concerns as interfaces, data conversions, and authorizations earlier than do most traditional implementations. The ASAP Roadmap consists of five phases: project preparation, business blueprint, realization, final preparation, go-live, and support continuous change.
Phase 1. Project Preparation. Proper planning and assessing organizational readiness is essential. Determine if there is a:
• full agreement that all company decision makers are behind the project
• clear project objectives
• efficient decision-making process
• company culture that is willing to accept change.
Phase 2. Business Blueprint.
Phase 3. Realization.
Phase 4. Final Preparation.
Phase 5. Go-Live and Support.
BUSINESS INTEGRATION METHODOLOGY (BIM)
•The BIM methodology, developed by Accenture Systems in the 1990s, is targeted for full-scale ERP projects that diagnose business integration needs, design business strategies and architectures, deliver one or more business capabilities to meet those needs, and ensure that the value of those capabilities can be sustained over time.
1.The Planning Phase.
2.The Delivering Phase
3.The Managing Phase.
4.The Operating Phase.


SYSTEMS DEVELOPMENT LIFE CYCLE

There are various technical and organizational challenges in implementing ERP depending on
•the organization,
•scope of implementation,
•business processes,

•and skill level of the people using these applications

SYSTEMS DEVELOPMENT LIFE CYCLE 
The process of developing new information systems is often called the system development life cycle (SDLC).It basically includes a
•systematic process of planning,
•designing,
•and creating an information system for organizations.
      
      For complex systems development projects (e.g., ERP), it is often better to have a structured methodology to avoid mishaps and coordinate the design and development tasks properly among the members of a large systems development team. 


TRADITIONAL SDLC



• The SDLC consists of tasks that are divided into phases or stages.
1.Investigation
2. Analysis
3. Design
4. Implementation
5. Maintenance

•. The SDLC process begins when someone in the organization  identifies a need for a new system. The reason could be to gain competitive advantage, improve operational efficiencies, expand business globally, or all of these. This investigation phase conducted by the IT department will determine the feasibility of successfully creating the new system from four different perspectives.
These perspectives are:
1. Organization feasibility-whether the new IT is aligned with the business strategy and plans of the organization
2. Technical feasibility-whether it is possible to solve the problem with the current generation of information technology
3. Economic feasibility-whether benefits from new system will outweigh the costs in the long term
4. Operational feasibility-whether the organization has the necessary resources to operate and support the new system

INVESTIGATION PHASE 

• the team should do a thorough analysis of the costs and benefits. The benefits derived from the new system as well as the costs associated with a new system are sometimes not very obvious
•Costs and benefits that can be quantified are called tangible, whereas those that cannot be quantified easily are called intangible.
• Benefits like productivity improvements with a new system similarly are tangible, whereas benefits gained due to better decision making are intangible
•A good development team will highlight these issues in their investigation report to top management such that they can plan for these expenses and revenues over a longer period of time, thereby increasing the chances for the new system to be implemented successfully.
• A report is prepared for management and other stakeholders at the end of the investigation phase. If approved, the project will begin the analysis phase; otherwise, the project is abandoned or merged with another project. 
ANALYSIS PHASE
•Before beginning the analysis phase, the development team is usually organized to include subject matter experts, consultants, and technical specialists. The primary task of the analysis phase is to determine the user requirements of the new system.
•One approach that works best is to focus on the problems of the current system
•The information collected from this phase is analyzed and categorized by different user groups and organized into a coherent list of new system-functional requirements.

DESIGN PHASE
In the design phase, the focus is on
•the new system's architecture,
•user interface,
•and reporting requirements.
These requirements are grouped by input, process, and output stages of a system. The design phase produces the blueprint or technical specifications of the new system. The technical requirements and the architecture will again be scrutinized by the management team. Once approved, the team can begin work on implementing the new system.
IMPLEMENTATION PHASE
The implementation phase begins with
•the acquisition of hardware, software, development of custom applications (if necessary),
• new system testing, training, and conversion of data from the old system to the new system.
 RAPID SDLC APPROACHES
 
The SDLC process has several problems, even though it is rigorous in making sure that the new system is complete and successful in the organization
• First, the time it takes to develop a new system is a long and tedious process.
•Second, the cost associated with the SDLC process is very high.
• Finally, all information systems do not require such a rigorous SDLC process.
• the SDLC would be overkill for a small-scale decision-making application; therefore, over the years organizations have used rapid approaches to SDLC that are quicker and less-expensive short-cuts to this process. These are called Rapid SDLC approaches.
•One rapid development approach is prototyping
Prototyping

 

Development Life Cycle: Case4-1:Opening Case: of men and mice: a case study

Jackson Laboratory is
•  nonprofit,
•  independent
•  world –reowned
Genetic research institue faunded in 1929.
Located in Bar Harbor,
Budget $80 million,

1200 employee.
•Jackson Laboratory decided to install an ERP system with $5 million budget and a 1 year time frame.
•Despite the installation challenges, the project's actual cost was close to the budget and took only about 6 months longer than expected.
  Major installation challenge was the integration of its unique mouse-development functions into Oracle's ERP system.
   . One of the problems faced by Jackson stemmed from an internal HR issue (i.e., the risk that the action or inaction of the software provider would hinder the implementation)
   modifying the ERP system to accommodate its business process, placing special emphasis on training, seeking a fixed-fee contract with Oracle and purchasing a surety bond to reduce project risk.


•Jackson Lab selected an integrated ERP suite from Oracle rather than a best-of-breed option.
•The Oracle applications suite included modules for process manufacturing, accounting, e-procurement, and HR, among others. Their biggest challenge was modification of the Oracle Process Manufacturing (OPM) module to accommodate the lab's unique business processes of raising and distributing mice.
The implementation team chose a phased implementation approach instead of a big-bang approach.
 The first phase initially went live in February, including the management of production capacity, accounts receivable, some general ledger functions, and the purchasing of manufacturing material; in April they launched other modules including accounting for research grants, the rest of general-ledger functions, accounts payable, and fixed assets.
For the second phase, which began in June, the remaining modules including process management, human resources, payroll, labor distribution, and a grant filing application were installed

•Jackson faced personnel problems during ERP installation when the best and brightest employees were involved in the implementation process leaving them short-handed to do the everyday work. In addition, Jackson's IT staff lacked experience with ERP, only one person had some experience in installing an ERP. Further cost overruns resulted \ from training, an especially big cost item. The timeand-materials basis contract would have increased the risk of overtime and going over budget because vendors and consultants have an interest in quoting low and seeing the work grow as the project proceeds.
•Jackson faced personnel problems during ERP installation when the best and brightest employees were involved in the implementation process leaving them short-handed to do the everyday work. In addition, Jackson's IT staff lacked experience with ERP, only one person had some experience in installing an ERP. Further cost overruns resulted \ from training, an especially big cost item. The timeand-materials basis contract would have increased the risk of overtime and going over budget because vendors and consultants have an interest in quoting low and seeing the work grow as the project proceeds.
•There is a natural competitiveness between the buyer and the ERP vendor. vendor benefits by placing a "veil of complexity" over their work; the buyer wants to get the system up and running with the least amount of work and customization.
•The service level agreements generay tend to be very complex because much clearer definition of roles and responsibilities between client and service provider is needed. From a consultant's and vendor's perspective, a high (>25 percent) contingency is quite reasonable depending on the nature of the work, whereas this is too much from the buyer's perspective
•Jackson Lab used several strategies to reduce the risk. First, they negotiated a fixed-fee contract with Oracle rather than use the more commonly used time-and-l11aterials contract. Second, they bought a surety bond from Gladwyne, a risk management conSUlting firm. This strategy protected Jackson Lab from the project's cost overruns caused by IT staff being forced to solve the technological challenges with "out-of-the-box thinking." Third, it spent considerable time and effort on changing the business processes and training its employees with the new processes. Finally, they got better cooperation from the vendor, Oracle, by negotiating a fixed-fee contract and a favorable service level agreement. In addition, Jackson Lab should have built a time buffer into their ERP implementation life cycle to avoid the pressure of delivering the system on a predetermined timeline. 



19 Kasım 2016 Cumartesi

BIDM-1

Data mining 
A process that uses statistical, mathematical, artificial intelligence and machine-learning techniques to extract and identify useful information and subsequent knowledge from large databases
How data mining works
Data mining tools find patterns in data and may even infer rules from them
Data mining task can be classified into three main categories:
⦁ Prediction
⦁ Association
⦁ Clustering
Classification 
Supervised induction used to analyze the historical data stored in a database and to automatically generate a model that can predict future behavior
Clustering
Partitioning a database into segments in which the members of a segment share similar qualities



11 Kasım 2016 Cuma

KÜN PARLIYOR!

Merak eden varsa söyleyelim. Kün sönmedi aksine tahmin ettiğimizden daha çok parlıyor.

İnsanlara umut olmak, ışık olmak bu yolda yürümek, verdiğimiz sözleri gerçekleştirmiş olmak, bütün zorluklara rağmen direnmek ve sonunda başarılı olmak. Hepsi baştan sona müthiş bir deneyimdi. Aldığımız hayırlı dualar, öğrendiğimiz onca şey bize şimdi yaşamak için güç veriyor.

Attığımız her adımda, milyonlarca riskle karşılaşmamız olmamıza rağmen Allah'ın rahmeti ile, bu zorlu süreçleri geçtik. Emek verdik, çaba sarf ettik ve Kün'ün parlamasını sağladık. Çok şükür ki ak gönül ile girdiğimiz bu yoldan pak gönül ile çıktık.

Ben tekrar tekrar ekip arkadaşlarıma, hocalarıma, bize inanan, gönül veren herkese teşekkür ediyorum.

Saygı ve sevgilerimle



22 Ekim 2016 Cumartesi

KÜN Parlayacak mı yoksa Sönecek mi?

Bende merak içerisindeyim, KÜN parlayacak mı yoksa sönecek mi? Bundan birkaç ay önce artık yolun bulunduğunu ve yürüme vaktini geldiğini söylemiştim kendime. Bir dostumun tavsiyesi ile ışık olalım dedim. Işık olalım karanlıklara. Bir yola çıktık, daha yolun başında sadece bu yolda yürümenin zor olduğunu biliyorduk. Sadece zor olduğunu ve hiçbir şeyin kolay olmayacağını söylediğimi hatırlıyorum. Her defasında da zor olsun ki kıymetli olsun diye ekliyordum. Eğer bir iş yapılacaksa insanların yarasına dokunsun, bir işine yarasın istedim, bu yolda yürüdük, bu yolu ülkü edindik.


Yolda yürürken elbette görmediğimiz, görmeyi dahi düşünmediğimiz şeyler ile karşılaştık. Bazıları yıllardır süregelen imtihanlardandı, bazısı nefes kesecek kadar acıtan türdendi. Bazısı da vardı ki kalbimizi küt küt ettirip daha önce hiç hissetmediğimiz o tatlı heyecanı hissettirdi.Acısı ile tatlısı ile, zorlukları ile kolaylıkları ile biz bu yolu yürüdük.


Ben delinin tekiyim. Benim gibi deli birisini takip eden arkadaşlarıma, bizimle aynı hayali paylaşan bütün gönüldaşlarımıza, bize bakıp gençliğini hatırlayan büyüklerimize, bize gerek sözle gerek fiil ile yardım eden her bir kişiye ayrı ayrı çok teşekkür ediyorum.


Bu yolun sonunda ne olur bilmiyoruz. Bu zamana kadar Allah'ın rahmeti ve yardımı ile geldiğimizi çok iyi biliyorum. Bundan sonrası da yine onun rahmeti ve yardımı ile gerçekleşecek bunu da çok iyi biliyorum. Aslına bakarsanız buraya kadar gelmek bile bizim için bir hayaldi. Rabbim'e şükür ki bu işin başına bizi koşturdu. Saatlerimizi boşa harcatmadı. Gençliğimizi HAK yolda harcamayı bizlere nasip etti.


Şimdi heyecan içinde yaklaşan günü bekliyoruz. Hepimiz ciddi merak içerisindeyiz. KÜN parlayacak mı  yoksa sönecek mi?


12 Ekim 2016 Çarşamba

HAYAT KÜÇÜK ŞEYLERDEN OLUŞUR,EĞER SEN SEVERSEN BÜYÜK OLURLAR…

Toprak Ana Hayata Uzanan Eller projemizle ev hanımlarının el becerilerini gün yüzüne çıkartıyoruz.
Ailelerine destek vermek isteyen ev hanımları, ticaret kabiliyetine sahip olan,ticari fikirleri olup istedikleri fırsat verilmemiş olan hanımlar ile iş yeri açmak isteyen ev hanımlarının birbirinden farklı yüzlerce el yapımı ürünlerini Altınpark ANFA B Salonunda sergileyecekler. Amacımız bir nebze de olsa onların kendilerini ifade edebilecekleri ,geliştirebilecekleri alanlar , durumlar oluşturmaktır. Kadınlarımızın öz güvenlerini kazanmalarını sağlamak , ekonomiye katılıp maddi özgürlüklerini kazanmalarına vesile oluyoruz. 02-06 Kasım 2016 tarihleri arasında tüm halkımızı el ürünleri fuarına davet ediyoruz.
Tansu Çiğdem

Kategoriler